Hello! Welcome to Boyu technology!
400 9289 018
English  中文 博宇CE ISO认证火炬标志

HOME - NEWS - Industry information BACK
影视城
Construction points of horizontal track type B.M.U
The rail type B.M.U is connected with the building structural board through the track system, and the track gauge is generally 0.8 to 4.0m, and the two tracks can be arranged on one plane or on the other plane. The rail system consists of three parts, the base, the connecting piece and the track. The frame of the B.M.U should be placed before the top of the structure, and the base height should be higher than 80mm above the roof surface.
博宇擦窗机登顶杭州华三通信技术有限公司(简称H3C)
Construction key of wall track type B.M.U
Wall rail type B.M.U is on the track along the inside of the parapet under the arrangement, embedded part is composed of 1 blocks of 10 ~ 16mm thick embedded steel plate and 6 or 16 Phi Phi 20 embedded steel bars.
博宇擦窗机工程实例:广州兴业仓储大楼项目 悬挂式&自爬式吊篮
Application of building Platform in construction industry
Suspended Working platform has been widely used in related industries in our country, and it has also been greatly improved and improved. But in terms of technology, manufacturing materials and processing technology, there is still a step forward space. If hoisting machine, lifting weight and self weight ratio can be bigger. In particular, the lifting capacity of the 800kg hoist is only 85kg higher than that of the 630kg hoist, but its weight is increased by nearly twice.
 
ABOUT BOYU

Introduction
Course
Corporate culture
PRODUCTS

B.M.U
Working Platform
Mast bing Platform

CASE

B.M.U
PLATFORM
CERTIFICATE

Qualification
Security
Honor
Patent
System
NEWS

Special issue
Industry
Question

Contact us

Contact
Service

Position